top of page

Water Shuttling
85+ secs vs 26 secs with CV

 

Water Shuttling

Keeping a charged supply line on the ground for a return refill is an important advantage in water shuttling/tendering operations. Utilizing the Cedar Valve for water shuttling saves 75% of the connect/disconnecting time compared to the conventional methods = More water available.
 

bottom of page